CNC Mass Production
Stability Control
From qualified samples to consistent batch delivery — the manufacturing capability that truly separates suppliers.
Sample qualification only proves a factory can make one good part. What creates lasting value is whether every batch remains the same after the order scales up.
CNC Mass Production
Stability Control
From qualified samples to consistent batch delivery — the manufacturing capability that truly separates suppliers.
Sample qualification only proves a factory can make one good part. What creates lasting value is whether every batch remains the same after the order scales up.

Stable Batch Delivery
One standard from prototype to tens of thousands of pieces
5M1E Six-Dimension Control
Man, Machine, Material, Method, Environment, Measurement — each with clear ownership
Three Real Cases · Verifiable Data
Same process continuously validated; records available for review
,
By
Sample Qualification ≠ Stable Mass Production
Many risks remain hidden during small-batch prototyping. Once volume increases, problems surface simultaneously.
Dimensions Slowly Drift
First half of the batch is within tolerance; later parts start going out of tolerance.
Surface Quality Inconsistent
Same program, same machine — tool marks vary in depth from part to part.
Shift Change = Quality Change
Day shift performs well; night shift does not.

Surface quality comparison: consistent finish (left) vs tool-mark variation (right). Same program, different process control.
After more than twenty years in CNC precision machining, we see this pattern repeatedly: samples look excellent and customers are satisfied. Once mass production begins, stability declines. Sample approval is only the entry ticket. If process, fixtures and parameters are not locked, every subsequent batch is another gamble.
Sample qualification is only the entry ticket. Whether every batch remains qualified is the real gap between suppliers.
Sample Qualification ≠ Stable Mass Production
Many risks remain hidden during small-batch prototyping. Once volume increases, problems surface simultaneously.
Dimensions Slowly Drift
First half of the batch is within tolerance; later parts start going out of tolerance.
Surface Quality Inconsistent
Same program, same machine — tool marks vary in depth from part to part.
Shift Change = Quality Change
Day shift performs well; night shift does not.

Surface quality comparison: consistent finish (left) vs tool-mark variation (right). Same program, different process control.
After more than twenty years in CNC precision machining, we see this pattern repeatedly: samples look excellent and customers are satisfied. Once mass production begins, stability declines. Sample approval is only the entry ticket. If process, fixtures and parameters are not locked, every subsequent batch is another gamble.
Sample qualification is only the entry ticket. Whether every batch remains qualified is the real gap between suppliers.
Almost All Failures Occur When No One Is Watching
Engineering Plastics: Batch-to-Batch Variation
PEEK, PEI differ in shrinkage and moisture. High thermal expansion, stick to tools, spring-back after days.
Machine Thermal Deformation
After hours of continuous running, bed and ball screw expand. Gradual change often missed by sampling.
Tool Wear: Operator Judgment
Tool tip wears gradually. By the time QC finds the defect, the whole batch is often finished.
Fixture Wear: Clamping Clearance
Repeated clamping creates clearance. Without scheduled replacement, dimensions float.
Process & Parameters Drift After Shift Change
Program version and offsets not controlled. Operators adjust tool offsets; shifts no longer match.
Workshop Foundation Settlement
Uneven floors amplify vibration and tool wear. GREFEE uses deep pile foundation reinforcement.
Structural Design: Datum Errors Accumulate
Thin walls deform; multi-datum parts accumulate error. GREFEE evaluates in DFM and adjusts structure or clamping when needed.
Very few of these seven can be avoided by luck. We control them one by one so every deviation stays manageable.
Almost All Failures Occur When No One Is Watching
Engineering Plastics: Batch-to-Batch Variation
PEEK, PEI differ in shrinkage and moisture. High thermal expansion, stick to tools, spring-back after days.
Machine Thermal Deformation
After hours of continuous running, bed and ball screw expand. Gradual change often missed by sampling.
Tool Wear: Operator Judgment
Tool tip wears gradually. By the time QC finds the defect, the whole batch is often finished.
Fixture Wear: Clamping Clearance
Repeated clamping creates clearance. Without scheduled replacement, dimensions float.
Process & Parameters Drift After Shift Change
Program version and offsets not controlled. Operators adjust tool offsets; shifts no longer match.
Workshop Foundation Settlement
Uneven floors amplify vibration and tool wear. GREFEE uses deep pile foundation reinforcement.
Structural Design: Datum Errors Accumulate
Thin walls deform; multi-datum parts accumulate error. GREFEE evaluates in DFM and adjusts structure or clamping when needed.
Very few of these seven can be avoided by luck. We control them one by one so every deviation stays manageable.
Equipment Is the Foundation — But Equipment Alone Cannot Solve All Mass-Production Problems
Nominal accuracy is not finished-part accuracy. The real question is whether dimensional distribution stays inside the same narrow band for eight continuous hours or three continuous months.
Allocate by Accuracy
Aerospace, medical and optoelectronics high-precision parts run on imported 5-axis with linear scales and thermal compensation. Less critical work uses high-end domestic 5-axis.
Allocate by Volume
Prototypes and medium batches use high-precision machines. Tens of thousands of pieces mix imported and high-end domestic machines to balance precision and cost.
Allocate by Material
Steel, aluminum, copper, titanium, engineering plastics, Bakelite, GFR and ceramics have very different cutting characteristics. Machines and tools are matched to material.
What Equipment Can Cover
- Thermal deformation: Thermal compensation prevents continuous drift
- Positioning: Full closed-loop linear scale feedback
- Tools: Wear threshold automatic alarm
- Dimensions: In-process measurement
What Equipment Cannot Cover
- Clamping: Uneven force deforms the workpiece
- Process: Bad tool paths scrape finished surfaces
- Incoming material: Mixed batches or residual stress
- People: Casual parameter changes destroy consistency
Machine accuracy ≠ part accuracy. Between them still stand tools, fixtures, process and inspection.
Equipment Is the Foundation — But Equipment Alone Cannot Solve All Mass-Production Problems
Nominal accuracy is not finished-part accuracy. The real question is whether dimensional distribution stays inside the same narrow band for eight continuous hours or three continuous months.
Allocate by Accuracy
Aerospace, medical and optoelectronics high-precision parts run on imported 5-axis with linear scales and thermal compensation. Less critical work uses high-end domestic 5-axis.
Allocate by Volume
Prototypes and medium batches use high-precision machines. Tens of thousands of pieces mix imported and high-end domestic machines to balance precision and cost.
Allocate by Material
Steel, aluminum, copper, titanium, engineering plastics, Bakelite, GFR and ceramics have very different cutting characteristics. Machines and tools are matched to material.
What Equipment Can Cover
- Thermal deformation: Thermal compensation prevents continuous drift
- Positioning: Full closed-loop linear scale feedback
- Tools: Wear threshold automatic alarm
- Dimensions: In-process measurement
What Equipment Cannot Cover
- Clamping: Uneven force deforms the workpiece
- Process: Bad tool paths scrape finished surfaces
- Incoming material: Mixed batches or residual stress
- People: Casual parameter changes destroy consistency
Machine accuracy ≠ part accuracy. Between them still stand tools, fixtures, process and inspection.
Main Fleet: Makino · DMG MORI · Mazak + High-End Domestic 5-Axis

GREFEE Mazak 5-axis machining center on the shop floor
Makino
High-rigidity bed + linear-scale full closed-loop. Aerospace and medical high-precision structural parts.
DMG MORI
Complex surfaces and high-speed milling. Optoelectronics and medical components.
Mazak
Efficient stable mass production for automotive and robotics. Continuous running with minimal drift.
Main Fleet: Makino · DMG MORI · Mazak + High-End Domestic 5-Axis

GREFEE Mazak 5-axis machining center on the shop floor
Makino
High-rigidity bed + linear-scale full closed-loop. Aerospace and medical high-precision structural parts.
DMG MORI
Complex surfaces and high-speed milling. Optoelectronics and medical components.
Mazak
Efficient stable mass production for automotive and robotics. Continuous running with minimal drift.
Man · Machine · Material · Method · Environment · Measurement — Six Dimensions Locked Together
Man (Personnel)
Training, assessment, certified operators only. Parameters locked; any change requires formal evaluation.
Certified · No unauthorized changesMachine
Foundation reinforcement, leveling, periodic repeatability verification.
Graded maintenance · Daily / weekly / monthlyMaterial
Certificates verified; composition, hardness, dimensions sampled. Residual-stress materials receive aging.
Qualified only · Zone identificationMethod (Process)
Every drawing receives DFM covering tolerance, wall thickness, sharp corners and clamping.
DFM report · Customer confirmationEnvironment
Constant temperature and humidity workshop with multi-point monitoring and records.
20±2 °C · 45–60 % RHMeasurement
First-article FAI report. Process sampling + full inspection of finished goods.
First article approved before productionHardware is the foundation. Standardized coordination of people, material, process, environment and measurement is the real root of batch consistency.
Man · Machine · Material · Method · Environment · Measurement — Six Dimensions Locked Together
Man (Personnel)
Training, assessment, certified operators only. Parameters locked; any change requires formal evaluation.
Certified · No unauthorized changesMachine
Foundation reinforcement, leveling, periodic repeatability verification.
Graded maintenance · Daily / weekly / monthlyMaterial
Certificates verified; composition, hardness, dimensions sampled. Residual-stress materials receive aging.
Qualified only · Zone identificationMethod (Process)
Every drawing receives DFM covering tolerance, wall thickness, sharp corners and clamping.
DFM report · Customer confirmationEnvironment
Constant temperature and humidity workshop with multi-point monitoring and records.
20±2 °C · 45–60 % RHMeasurement
First-article FAI report. Process sampling + full inspection of finished goods.
First article approved before productionHardware is the foundation. Standardized coordination of people, material, process, environment and measurement is the real root of batch consistency.
Man — Personnel Control
- Technicians and inspectors trained and assessed before taking post.
- After sample approval, machine parameters are locked — hard rule.
- Any real parameter change evaluated by project team before production.
- Shift handover verifies tool offsets, program version and coordinate system.
- Critical processes assigned to experienced operators only.
Machine — Equipment Control
- Deep pile foundation reinforcement; leveling after installation.
- Repeatability verified periodically; data archived.
- Tool and fixture wear monitored; threshold triggers automatic stop.
- Graded maintenance: daily, weekly, monthly checks signed.
- Every machine has its own equipment file.
Material Control
- Batch and material certificates checked; mismatches rejected immediately.
- Sampling verifies composition, hardness and external dimensions.
- Residual-stress materials receive aging before machining.
- Only fully qualified lots enter warehouse; non-conforming returned.
- Storage segregated by material type with clear batch ID.
- Aluminum: 6061-T6 and T651 behave differently after machining.
Process Control
- Project team issues DFM report — production never scheduled on raw drawing alone.
- Tolerances, wall thickness, sharp corners reviewed item by item with customer.
- Clamping strategy and tool selection evaluated together.
- Agreed process signed by both parties.
- Process changes follow formal review — no verbal or on-floor changes.
- Thin-wall and multi-datum parts: deformation and clamping sequence calculated in review.
What the DFM Report Covers
Every Step Leaves a Record
Drawing & DFM
Tolerances, wall thickness, datums reviewed. Manufacturability report before scheduling.
Records: DFM report, risk listProgramming & Tool Paths
Program version, tool grades, clamping method archived together.
Records: Program package, tool listClamping & Machining
Clamping force and cutting parameters follow process package. Changes require signature.
Records: Change request, patrol checklistFirst Article & Full Inspection
FAI report required. Full-item inspection must pass before batch release.
Records: FAI report, full dimension data



Process locking is not about locking files in a drawer. It is about ensuring every shift performs the identical work.
Every Step Leaves a Record
Drawing & DFM
Tolerances, wall thickness, datums reviewed. Manufacturability report before scheduling.
Records: DFM report, risk listProgramming & Tool Paths
Program version, tool grades, clamping method archived together.
Records: Program package, tool listClamping & Machining
Clamping force and cutting parameters follow process package. Changes require signature.
Records: Change request, patrol checklistFirst Article & Full Inspection
FAI report required. Full-item inspection must pass before batch release.
Records: FAI report, full dimension data



Process locking is not about locking files in a drawer. It is about ensuring every shift performs the identical work.

Constant-temperature workshop — 20 °C / 52 % RH displayed

Precision inspection lab — Zeiss SPECTRUM CMM
Environment Control
Workshop maintains 20±2 °C and 45–60 % RH. Stable environment removes thermal expansion as a variable. Multi-point monitoring records data on schedule so conditions remain traceable.
Quality Measurement
First-article confirmation is mandatory after setup. Quality verifies appearance and structure; functional testing when required; full-dimension FAI issued. Batch production starts only after first-article approval. Process sampling at defined frequency; finished goods receive full inspection against drawing.
When Problems Occur — How We Handle Them
Certificates checked; composition, hardness, dimensions sampled
Timed checks on deformation, dimensional drift, appearance
Full inspection against drawing; records generated
Product, documents and packaging re-verified
Trace FAI, records, certificates, machine & tool status
What Happens After an Abnormality
Multi-department review finds true root cause. Improvement plan with owners and deadlines. Effect verified so the same problem does not recur. Lessons fed back into DFM review points.
Quality Is Everyone’s Job
Whoever machines performs self-inspection; whoever inspects signs. A defect found inside the factory costs one rework; a defect found at the customer’s line costs a line stoppage.
The abnormality is not closed until the same problem never happens again.
When Problems Occur — How We Handle Them
Certificates checked; composition, hardness, dimensions sampled
Timed checks on deformation, dimensional drift, appearance
Full inspection against drawing; records generated
Product, documents and packaging re-verified
Trace FAI, records, certificates, machine & tool status
What Happens After an Abnormality
Multi-department review finds true root cause. Improvement plan with owners and deadlines. Effect verified so the same problem does not recur. Lessons fed back into DFM review points.
Quality Is Everyone’s Job
Whoever machines performs self-inspection; whoever inspects signs. A defect found inside the factory costs one rework; a defect found at the customer’s line costs a line stoppage.
The abnormality is not closed until the same problem never happens again.
On the Day the Sample Is Confirmed — Lock the Process
What Is Locked at Confirmation
- CNC program version and tool-path files (with manual verification)
- Tool grade, holder specification and tool length
- Fixture drawings and clamping / locating scheme
- Cutting parameters: speed, feed, depth of cut, stock
- Tool-offset reference and coordinate-system setup
- Coolant method and nozzle position
How It Is Managed After Locking
- Process package archived; production, quality and customer each hold a copy.
- Operators cannot change tool offsets privately. Any change is risk-assessed and recorded.
- High-precision projects prefer the prototype machine for mass production.
- Repeat orders retrieve the original process package — no re-proving needed.
| Process Item | Archived Content | Owner |
|---|---|---|
| Program | Program version, tool-path files, verification records | Programming |
| Tools | Grade, holder, tool length & life counter | Process Engineering |
| Fixtures | Fixture drawings, clamping points & force scheme | Shop Floor |
| Parameters | Speed, feed, depth of cut, tool offset & coordinate reference | Process Engineering |
The 1st piece and the 10,000th piece use the same parameters and the same program.
On the Day the Sample Is Confirmed — Lock the Process
What Is Locked at Confirmation
- CNC program version and tool-path files (with manual verification)
- Tool grade, holder specification and tool length
- Fixture drawings and clamping / locating scheme
- Cutting parameters: speed, feed, depth of cut, stock
- Tool-offset reference and coordinate-system setup
- Coolant method and nozzle position
How It Is Managed After Locking
- Process package archived; production, quality and customer each hold a copy.
- Operators cannot change tool offsets privately. Any change is risk-assessed and recorded.
- High-precision projects prefer the prototype machine for mass production.
- Repeat orders retrieve the original process package — no re-proving needed.
| Process Item | Archived Content | Owner |
|---|---|---|
| Program | Program version, tool-path files, verification records | Programming |
| Tools | Grade, holder, tool length & life counter | Process Engineering |
| Fixtures | Fixture drawings, clamping points & force scheme | Shop Floor |
| Parameters | Speed, feed, depth of cut, tool offset & coordinate reference | Process Engineering |
The 1st piece and the 10,000th piece use the same parameters and the same program.
Three Historical Failure Reviews — Now Written into Standard Process Rules
After 300 Pieces, Dimensions Started to Drift
Abnormality Description
High-end precision aluminum cavity. First articles fine. After ~300 pieces, locating-hole step height went out of tolerance; some parts showed tool marks. Defect rate ≈ 6 %.
Root Cause
Poor programming origin; multiple tool changes accumulated error; auto-generated tool paths without manual verification scraped finished surfaces; heat accumulation and incomplete coolant coverage amplified variation.
Corrective Actions
Re-selected origin and tool-setting reference to main locating datum. Manually reviewed and optimized tool paths. Reduced feed slightly; repositioned coolant nozzles. Increased sampling to every 50 pieces.
Result
60,000 pieces produced continuously. Step height fully in tolerance; tool marks eliminated; defect rate < 0.05 %. Customer assembles directly upon receipt.

Quantities are continuous verification batches under the same process. Inspection records and first-article reports can be provided.
Tool & Fixture Changes Could Not Stop Irregular Fluctuation
Abnormality Description
Automotive aluminum structural part. Small batch OK. Mass production showed irregular dimensional fluctuation with no fixed trend. Changing fixtures and tools did not solve it.
Root Cause
Ball-screw transmission clearance from long-term continuous running. Guideway fasteners slightly loose. Chips accumulated on guideway reference surfaces, amplifying transmission error.
Corrective Actions
Re-tightened critical supports; cleaned guideway reference surfaces. Enabled transmission clearance compensation in CNC. Adjusted fixture clamping layout. Added screw clearance and guideway cleanliness to every-shift checklist.
Result
12,000 pieces continuous production. Irregular fluctuation eliminated; yield > 99.9 %. Customer no longer needs 100 % incoming screening.

Left for Three Days — Dimensions Changed by Themselves
Abnormality
Thin-wall aluminum housings. Flatness within 0.02 mm at machine exit. After 72 hours on the inspection table, flatness went out of tolerance.
Root Cause
Residual stress in blank not fully released. Roughing redistributed stress; finish machining “held” dimensions that later sprang back.
Actions
Switched to T651 pre-stretched stress-relieved blanks. Added static aging after roughing before finish. Adjusted cutting parameters to introduce less stress.
Result
After 72-hour holding, flatness stable within tolerance. Same process has not recurred.
Why this is hardest to catch: At outgoing inspection the part is still good. Measurement cannot detect a future failure. When the customer finds it days later, responsibility becomes difficult to assign.
Prevention is the only reliable path: Correct blank selection, time for stress release after roughing, and minimized new stress during cutting.
Inspection can screen out parts that are already bad. It cannot screen out parts that will become bad a few days later.
Three Historical Failure Reviews — Now Written into Standard Process Rules
After 300 Pieces, Dimensions Started to Drift
Abnormality Description
High-end precision aluminum cavity. First articles fine. After ~300 pieces, locating-hole step height went out of tolerance; some parts showed tool marks. Defect rate ≈ 6 %.
Root Cause
Poor programming origin; multiple tool changes accumulated error; auto-generated tool paths without manual verification scraped finished surfaces; heat accumulation and incomplete coolant coverage amplified variation.
Corrective Actions
Re-selected origin and tool-setting reference to main locating datum. Manually reviewed and optimized tool paths. Reduced feed slightly; repositioned coolant nozzles. Increased sampling to every 50 pieces.
Result
60,000 pieces produced continuously. Step height fully in tolerance; tool marks eliminated; defect rate < 0.05 %. Customer assembles directly upon receipt.

Quantities are continuous verification batches under the same process. Inspection records and first-article reports can be provided.
Tool & Fixture Changes Could Not Stop Irregular Fluctuation
Abnormality Description
Automotive aluminum structural part. Small batch OK. Mass production showed irregular dimensional fluctuation with no fixed trend. Changing fixtures and tools did not solve it.
Root Cause
Ball-screw transmission clearance from long-term continuous running. Guideway fasteners slightly loose. Chips accumulated on guideway reference surfaces, amplifying transmission error.
Corrective Actions
Re-tightened critical supports; cleaned guideway reference surfaces. Enabled transmission clearance compensation in CNC. Adjusted fixture clamping layout. Added screw clearance and guideway cleanliness to every-shift checklist.
Result
12,000 pieces continuous production. Irregular fluctuation eliminated; yield > 99.9 %. Customer no longer needs 100 % incoming screening.

Left for Three Days — Dimensions Changed by Themselves
Abnormality
Thin-wall aluminum housings. Flatness within 0.02 mm at machine exit. After 72 hours on the inspection table, flatness went out of tolerance.
Root Cause
Residual stress in blank not fully released. Roughing redistributed stress; finish machining “held” dimensions that later sprang back.
Actions
Switched to T651 pre-stretched stress-relieved blanks. Added static aging after roughing before finish. Adjusted cutting parameters to introduce less stress.
Result
After 72-hour holding, flatness stable within tolerance. Same process has not recurred.
Why this is hardest to catch: At outgoing inspection the part is still good. Measurement cannot detect a future failure. When the customer finds it days later, responsibility becomes difficult to assign.
Prevention is the only reliable path: Correct blank selection, time for stress release after roughing, and minimized new stress during cutting.
Inspection can screen out parts that are already bad. It cannot screen out parts that will become bad a few days later.
Every Batch Must Match the First Batch








Different parts can promise different absolute accuracies. The gap between parts inside the same batch must be the same.
Every Batch Must Match the First Batch








Different parts can promise different absolute accuracies. The gap between parts inside the same batch must be the same.
All Numbers on One Page
These are records generated on real projects. Customers who wish to verify can request the corresponding inspection records and first-article reports.
Defect rate after improvement < 0.05 %
Yield > 99.9 %
Two orders of magnitude improvement
Humidity 45–60 % RH, multi-point records
Production starts only after approval
Steel / Al / Cu / Ti / Plastics / Bakelite / GFR / Ceramics
Stability is not a result. It is the result of a complete set of fixed actions repeated over and over.
All Numbers on One Page
These are records generated on real projects. Customers who wish to verify can request the corresponding inspection records and first-article reports.
Defect rate after improvement < 0.05 %
Yield > 99.9 %
Two orders of magnitude improvement
Humidity 45–60 % RH, multi-point records
Production starts only after approval
Steel / Al / Cu / Ti / Plastics / Bakelite / GFR / Ceramics
Stability is not a result. It is the result of a complete set of fixed actions repeated over and over.
What SQEs Really Look At
Customers do not need a certificate. They need the processes behind that certificate to be delivered on the actual project.
What SQEs Really Look At
Customers do not need a certificate. They need the processes behind that certificate to be delivered on the actual project.
How GREFEE Differs from Ordinary CNC Shops
Typical Approach
Most factories focus on “making this one piece”. Sample stage shows little difference. Once volume rises, problems return to the customer to be absorbed.
GREFEE Approach
Center of gravity on mass-production consistency: front-loaded DFM, process locking, process patrol and abnormality closed loop. Stable batch delivery, not just a good-looking sample.
Fewer incoming defects, less assembly rework, schedules without rework buffer; audit documents available.
Making a good sample is skill. Making a stable batch is capability.
How GREFEE Differs from Ordinary CNC Shops
Typical Approach
Most factories focus on “making this one piece”. Sample stage shows little difference. Once volume rises, problems return to the customer to be absorbed.
GREFEE Approach
Center of gravity on mass-production consistency: front-loaded DFM, process locking, process patrol and abnormality closed loop. Stable batch delivery, not just a good-looking sample.
Fewer incoming defects, less assembly rework, schedules without rework buffer; audit documents available.
Making a good sample is skill. Making a stable batch is capability.
Take Your Parts from Sample Qualification to Stable Batch Delivery
Submit drawings. Engineering first performs DFM, surfaces risks, then decides whether to prototype.

Key Factory Capabilities
- Max envelope: 3500 × 1800 × 1200 mm; highest short-travel accuracy ±0.001 mm
- Workshop: Constant 20±2 °C, humidity 45–60 % RH
- Inspection: CMM, 2.5D, optical projector, roughness, contour
- Materials: Steel / Al / Cu / Ti / Engineering plastics / Bakelite / GFR / Ceramics
Projects That Fit Us
- Samples good but mass production keeps failing — process needs re-locking
- Batches from hundreds to tens of thousands where stability must come from process, not sorting
How Cooperation Starts
2D / 3D, material grade, volume, critical tolerances
Manufacturability opinion and risk points within two days
Small-batch samples confirm dimensions, appearance, assembly
Process locked, phased delivery with inspection records
Standard projects: preliminary assessment the same day. Complex multi-cavity or impeller parts discussed case by case.
Submit Drawings NowEvaluate Stability First, Then Price
Take Your Parts from Sample Qualification to Stable Batch Delivery
Submit drawings. Engineering first performs DFM, surfaces risks, then decides whether to prototype.

Key Factory Capabilities
- Max envelope: 3500 × 1800 × 1200 mm; highest short-travel accuracy ±0.001 mm
- Workshop: Constant 20±2 °C, humidity 45–60 % RH
- Inspection: CMM, 2.5D, optical projector, roughness, contour
- Materials: Steel / Al / Cu / Ti / Engineering plastics / Bakelite / GFR / Ceramics
Projects That Fit Us
- Samples good but mass production keeps failing — process needs re-locking
- Batches from hundreds to tens of thousands where stability must come from process, not sorting
How Cooperation Starts
2D / 3D, material grade, volume, critical tolerances
Manufacturability opinion and risk points within two days
Small-batch samples confirm dimensions, appearance, assembly
Process locked, phased delivery with inspection records
Standard projects: preliminary assessment the same day. Complex multi-cavity or impeller parts discussed case by case.
Submit Drawings Now — Evaluate Stability First, Then Price