Strategic Pillars of Precision Engineering Excellence

At GREFEE, a well-structured project management plan is the core of delivering excellence in every project. From RFQ to final delivery, effective project management is the key to success.

GREFEE aims to ensure that the mold design and manufacturing process meet customer requirements while ensuring the smooth progress of the project.

Mold flow report and proposal before mold design for customer review and confirm

The final mold review is conducted based on product drawings and machine specifications to ensure the mold meets customer requirements. Additionally, an evaluation is carried out with various departments to ensure both mold quality and delivery timelines are met.

Mold Review Meeting to confirm mold delivery timeline
Mold Review Meeting Minutes

Organize and compile relevant documents, including Certificate of Conformance, Dimensional Report, and RoHS Compliance. Submit to the client, and proceed with mold processing only after document confirmation.

Hold a meeting to discuss molds that don’t meet expectations, summarize mold and product issues, confirm modification plans and timelines. Submit the issues and modification plans to the client for approval, and confirm mold repair and trial dates.

Clean all parts, check for potential damage risks, and replace any defective components. Ensure backups are available for critical parts such as nozzles, springs, seals, special ejector pins, seals, and extended nozzles.

Part Cleaning, Rust Removal, and Replacement 
Pressure Test After Replacing Water Transport Components
Install Nameplate and Junction Box
Install Lifting Tool
Vacuum Packaging
Boxing

    Connect With Us

    +86-755-23287576 FreeQuote@grefeemold.com

    Related Links

    Related Cases

    Related Links

    Related Cases

    Related Links

    Related Cases

    Related Links

    Related Cases

    Related Links

    Related Cases

    keywords:5 axis cnc CNC milling 5 axis cnc machine CNC machining services CNC maching